Conservatory At Factory Trade Counter, Belfast - October 2007

A leading material supplier based in Belfast Docks were extending their trade counter by adding a conservatory. This area of Belfast is notorious for it's ground conditions, so Larsen were required to install Ductile cast Iron Piles to counter this. The customer required the busy sales desk and dispatch yard to remain open throughout the installation. As a result the piles were installed within a few hours to allow business to continue unaffected. Piles were installed in close proximity to the existing structure to a vibration limit of 5mm/s.

  • 5 No 118mm Piles
  • Piles 21m deep
  • Up to 200kn SWL
  • Vibration monitoring was carried out at all times to a PPV of 5mm/s using our Alarmed Vibration Monitors
  • No spoil
  • No wasted pile cut off generated
  • Main Contractor - Ashgrove
  • Engineer - MWL Consulting