Housing Development, Castlerea, Co Roscommon - May'05

A housing development at Castlerea, Co Roscommon required phased piling. The site had rock at varying depths, from 3m upwards. Our DCI piling was competitive on price and also helped to minimise the need for site preparation. Pile waste was also reduced to zero. The DCI pile, as it embeds the toe of the pile into rock, is more stable than other piling systems which stop on the rock head.

  • 460No 118mm DCI piles
  • Up to 600kN SWL
  • Piles from 3-7m in length
  • Short piles to rock in some areas of the site
  • Minimal site preparation
  • Zero pile wastage
  • Piles cut off and capped by Larsen Foundations
  • Main Contractor - Westcam Developments Ltd