House Renovation - Dublin 4, Sept 2008

A house renovation in Dublin 4 required internal piling to facilitate a new load bearing wall. Access was extremely limited with access via a standard doorway. The floor was exposed by the main contractor enabling us to complete the internal piling in one day.

  • 4No 219mm piles
  • Average 5m deep
  • Up to 250kN SWL
  • Zero Spoil
  • No wasted pile cut off generated
  • Restricted access

An single story extension was also required at the same property. Using the same mini piling rig as for the internal works the external piling wascompleted in a single day.

  • 4No 219mm piles
  • Average 5m deep
  • Up to 250kN SWL
  • Zero Spoil
  • No wasted pile cut off generated